Perry Boulevard, looking south toward downtown Buffalo. Bridge abutments at
left remain from the Porter Avenue bridge
over the Erie Canal (State Barge Canal). When this portion of the canal was
filled in after 1937, it was was renamed Perry
Boulevard. Farther along the roadway toward the city on the left side was the
newly-constructed Lakeview Housing Project.
This portion of the canal, up to Porter Avenue, was filled in because of the
Project's proximity and the belief that the watered
but unused canal posed a health hazard to residents of the new public housing.
(The canal from Porter Avenue north was not
filled in until 1957 when the Thruway was constructed along the canal bed and
the name 'Perry Boulevard' disappeared
from history.)
Note: the bridge abutments remain visible in 2003 and are being used to support the Porter Avenue bridge over the Thruway.